The Ministry of Power (MoP) initially introduced green open access rules in the form of a draft, back in August 2021. After receiving public comments to the draft, the Green OA Policy was finalized and published as "Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022" on June 6, 2022. The new policy received very positive feedback from the whole OA industry. The salient features of this policy have been summarized in the table below.



Table 1: Summary of "Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022"

Source: Ministry of Power, JMK Research

Green open access rules aims to provide a standardized framework for OA deployment across India. Some positive steps for RE OA development outlined in policy are:

  • The green open access rules specifies that a Forum of Regulators (FOR) will be appointed to determine a common methodology for determination of all OA Charges. This determination will be done within a period of 4 months from the date of implementation of green open access rules.
  • Banking of unused power is a critical provision for the green OA market. But, there are several states (Haryana, West Bengal, Telangana, etc.) which have been restricting renewable energy (RE) banking. Few states like Tamil Nadu do not even allow banking. So, MoP clarifying (through green open access rules) that banking will be provided at least on a monthly basis is all-in-all a major positive leap. 
  • Exemption of Additional Surcharge (AS) for green OA consumers (provided the consumers already pay fixed charges) is a highly encouraging step. 
  • The policy appoints Load Dispatch Center (LDC)/ State Transmission Utility (STU)/ Central Transmission Utility (CTU) as the nodal agencies for green OA. This has been done to reduce the influence of DISCOM in the OA approval process. Thus, there is high expectation that the OA application clearance window of 15 days (as specified in the policy) can be implemented.

On the other hand, there are some other policy provisions that need further clarification:

  • Green open access rules mention a clause disallowing carry forward of banked energy from one month to another. This is a discouraging step considering the states that already provide annual banking of RE. This clause may prompt them to switch to monthly banking system. 
  • In relation to the new policy abolishing AS if the C&I consumer pay fixed charges, it may be inaccurate to assume that the liability towards stranded assets is subsumed in fixed charges. AS & fixed charges have different computation methodologies and have generally served different purpose in tariff structure.
  • The policy reduced the eligibility for green OA to any consumer having a sanctioned load of 100kW. This might create an implementation tussle between the centre and the states, as most of the states currently set their OA eligibility limit at 1MW. 

Policy certainty and consistency across the country have been strongly demanded by OA players for many years. The green open access rules, if implemented correctly and timely, has the potential to spur the OA market. Indeed, the clarity with respect to OA charges, offered by the new policy could enhance the viability of OA projects and long-term visibility of the market. 

However, India is a huge and diverse country. A "One-size-fits-all" policy has the potential to create several implementation challenges. Section 42 of the Electricity Act, 2003, grant State Electricity Regulatory Commissions (SERCs) the jurisdictional powers to determine OA charges and OA eligibility capacity limits for their respective states . Hence, the actual implementation of green open access rules rests with the states. Thus, all stakeholders now keenly await responses from state commissions, to understand to what degree the states will be aligned with the with the green open access rules. 



JMK Research & Analytics, in association with SMEV, is organizing the INDIA EV MARKET CONCLAVE, 2022 with the theme 'Fast-tracking EV Growth', on July 28, 2022 (Thursday) at The Leela Ambience, Gurugram from 09:30 am to 05:00 pm.

The event is "officially supported" by NITI Aayog. Confirmed 29+ CXO level speakers, 200+ attendees expected.

For further details, check out the link below.
Click here
Twitter
LinkedIn
Website
YouTube
Copyright © JMK Research 2022, All rights reserved.
Plot No. 23, Udyog Vihar, Sector 18, Gurgaon,+91-7428306655
To subscribe to our mailers, please click here


You can unsubscribe from this list.






This email was sent to punjabsvera@gmail.com
why did I get this?    unsubscribe from this list    update subscription preferences
Research and Consulting · 27/ 2C, Palam Vihar · gurgaon, 122017 · India

Post a Comment

Previous Post Next Post

Contact Form