Chennai Power Shutdown on 12-08-2020

Power supply will be suspended in the following areas on 12.08.2020 from 09.00 am to 02.00 pm for maintenance work. Supply will be resumed before 02.00 P.M if the works are completed. AVADI  KOVILTHAGAI AREA : Kalaignar Nagar, Kovilpathgai main road, Part of Poompozhil nagar, Kannadapalayam, Mettu street, Bharathi nagar, Sundararaja perumal koil area, Swami nagar. REDHILLS-I & SHOLAVARAM  AREA… Continue reading "Chennai Power Shutdown on 12-08-2020"

The post Chennai Power Shutdown on 12-08-2020 appeared first on Tamil Nadu News, Chennai News, Tamil Cinema News, Tamil News, Tamil Movie News, Power Shutdown in Chennai, Petrol and Diesel Rate in Chennai.



Post a Comment

Previous Post Next Post

Contact Form